Posts

Showing posts from February, 2021

More Setting

It's hard to upload videos straight onto here, but I wanted to show a little more of how I'm filming the opening based on my storyboard. This is just a test video that I uploaded to Youtube, and I filmed it a little too fast, so it won't be used in the final product.    https://youtu.be/ApDcHmFTfbM

Location Shot

Image
  Wanted to add another setting/location shot. The first picture of my backyard is where the final scene will take place, but this is the street where all the running is happening. 

Final Script

Image
   Aaaand this is the final script. I'm going to be following this, more or less, but it won't be verbatim. Mainly because I might change some minor details to create more impact while filming. 

Script Draft

Image
  First draft of the script. Just wanted to get the main points down, will add the details later. 

March Schedule

Image
  Dots: Filming Days Plus: My day of editing everything together Star: Final Opening due!!! Circle: Reflection due, which means I'll be filming it that whole week. Long line: Spring break!!! And no more projects 

Storyboard Pt. 1

Image
  This is the storyboard for the first scenes that I plan to film. I make the storyboard in parts and I only do it for what I plan to film for the day, because I often change my mind on what I want to do so I don't want to set things in stone and then go back and have to remake it. 

Re: Re: Schedule

Image
 Ok so here's my new official schedule.  The line under today is for when I finished the first draft of the script. The little plus sign is when I finalize the script. And all the stars represent filming days.  This is the absolute schedule I'm going to follow. I know I made one before but that was just a temporary planning schedule that I made on a whim. Now I know exactly when my project is due and also how much time I need to do it. I tried to space out the filming days because I know that my brother won't want to work back to back and also I tend to lose motivation when I feel like I have to do a lot of things at once.  This is just for February but I'm going to make another schedule for March next week too. I don't know for sure how many filming days I need but I'm going to do a lot and test out a lot of things.